BUILDING INFORMATION. Akademiliv provides an overview of the construction project for new premises for the faculty of science and reconstruction work in Medicinarelängan and the Lundberg Laboratory. Rebuilding of replacement premises may continue to cause disturbing noise. Week 6 is the time for an official inauguration of the building project for the Faculty of Science. If you have any questions about the construction activities, feel free to email medicinareberget@gu.se.
WEEK 5, January 27 – 31.
Medicinaregatan 14 – replacement premises for parts of the Institute of Biomedicine
Due to the new construction for the Faculty of Science, preparations for replacement premises for parts of the Department of Biomedicine are ongoing. The former Akademiska Hus operating office will therefore be renovated during winter/spring of 2020.
Preparatory groundwork will be carried out between January 7 and February 4, during which period the parking space will be closed (marked in green). The activities might cause disturbing noise during daytime.
Here you can see a map of rebuilding at Medicinaregatan 14 (Swedish only): https://gubox.box.com/s/k17wqpzfl66uljgc58c4hxqm36s78nr0
Medicinarelängan lower floor – replacement premises for CCI
Reconstruction is ongoing in order to prepare for docking the new building for the Faculty of Science and to provide temporary premises for Center for Cellular Imaging, CCI, who will move from 7A to Medicinaregatan 5. The work means disturbing noise particularly during hours stated below.
This reconstruction work will continue in February, 2020.
Hours in week 5 with increased noise disturbances:
- Mon Jan 27, 07:00-10:00
- Tue Jan 28, 07:00-09:00
- Wed Jan 29, 07:00-08:00, 12:00-13:00
- Thu Jan 30, 07:00-08:00
- Fri Jan 31, 07:00-08:00
Here you can see a map of rebuilding CCI (Swedish only): https://gubox.box.com/s/6s3uohqnpk0jtzum6fjorn45b338hawl
Modules at Lundberg Laboratory
The construction is largely completed and the passage between the actual building and the modules is in place. Some work remains, for instance installation of automatic door openers.
The supplier of laboratory furnishings will be on site and start to prepare for deliveries.
Lundberg Laboratory
The replacements of ventilation units on the roof of the Lundbergslab is completed.
On the third and fourth floor work has come quite far. Additional installations are carried out and thereafter preparations for the deliveries of laboratory furnishings are made. The deliveries might cause waiting times for those who need to use the lifts.
Further on the reconstruction on second floor will start, but currently no time plan has been presented.
New premises for the Faculty of Science
Drilling and blasting for the basement floor of the new building, on level four, is continuing. In week 5, an additional excavator will join the scene to increase the outloading capacity for the road behind the EBM media central. This means trucks passing in and out via both gates. In the crossing between EBM and the Wallenberg conference center there will be a safety guard to assist, as the trucks need to back in through the gate. Please pay attention to instructions from the guard.
Please also respect the closed walkway to the right in the slope in the direction of the main entrance of Medicinarelängan and Academicum. Always use the left walkway and not use the car lane.
Blasting in week 5 will take place Tuesday and Thursday at 12.30 with reserve time at 15.00 on the same days.
WEEK 6, February 3 – 7.
Medicinaregatan 14 – replacement premises for parts of the Institute of Biomedicine
Due to the new construction for the Faculty of Science, preparations for replacement premises for parts of the Department of Biomedicine are ongoing. The former Akademiska Hus operating office will therefore be renovated during winter/spring of 2020.
Preparatory ground work will be carried out between January 7 and February 4, during which period the parking space will be closed (marked in green) the activities might cause disturbing noise during daytime.
On February 5-6, an office module from the Faculty of Humanities will be moved here to add extra office space. For this activity, all parking spaces on Medicinaregatan 14 will be closed.
Here you can see a map of rebuilding at Medicinaregatan 14 (Swedish only): https://gubox.box.com/s/k17wqpzfl66uljgc58c4hxqm36s78nr0
Medicinarelängan lower floor – replacement premises for CCI
Reconstruction is ongoing in order to prepare for docking the new building for the Faculty of Science and to provide temporary premises for Center for Cellular Imaging, CCI, who will move from 7A to Medicinaregatan 5.
The work means disturbing noise particularly during hours stated below.
This reconstruction work will continue in February, 2020.
- Mon Feb 3, 07:00-08:00
- Tue Feb 4, 07:00-08:00
- Wed Feb 5, 07:00-08:00, 12:00-13:00
- Thu Feb 6, 07:00-08:00
- Fri Feb 7, 07:00-09:00, 12:00-13:00
Here you can see a map of rebuilding CCI (Swedish only): https://gubox.box.com/s/6s3uohqnpk0jtzum6fjorn45b338hawl
Modules at Lundberg Laboratory
The construction is largely completed and the passage between the actual building and the modules is in place. Some work remains.
The supplier of laboratory furnishings will be on site and start to prepare for deliveries.
Lundberg Laboratory
The replacements of ventilation units on the roof of the Lundbergslab is completed.
On the third and fourth floor work has come quite far. Additional installations are carried out and thereafter preparations for the deliveries of laboratory furnishings are made. The deliveries might cause waiting times for those who need to use the lifts.
Further on the reconstruction on second floor will start, but currently no time plan has been presented.
New premises for the Faculty of Science
In week 6 it is time for the official starting ceremony for the new construction project for the Faculty of science.
The regular blast on Thursday February 6 marks the starting point of the ceremony. All interested are welcome to attend the ceremony at the construction site from 12.00, where snacks and drinks are served First come, first served! A calendar post on Medarbetarportalen will provide more information. Additional safety measure will be taken for this event and guests at the ceremony will directed to a restricted part of the area. Barriers will be put up to mark the safe area.
On the day of the ceremony, there will be no outloading. Apart from that the outloading in week 6 will be done through both gates.
Blasting in week 5 will take place Tuesday and Thursday at 12.30 with reserve time at 15.00 on the same days.
WEEK 7, February 10– 14.
Medicinaregatan 14 – replacement premises for parts of the Institute of Biomedicine
Due to the new construction for the Faculty of Science, preparations for replacement premises for parts of the Institute of Biomedicine has been initiated.
The former Akademiska Hus operating office will therefore be renovated during winter/spring of 2020. An additional module will also be moved from the Faculty of Humanities to Medicinareberget for increased office space.
In week 7 the modules are all in place. Installation work is done in the interior. One half of the parking lot continues to be closed throughout the work.
Here you can see a map of rebuilding at Medicinaregatan 14 (Swedish only): https://gubox.box.com/s/k17wqpzfl66uljgc58c4hxqm36s78nr0
Medicinarelängan lower floor – replacement premises for CCI
Reconstruction is ongoing in order to prepare for docking the new building for the Faculty of Science and to provide temporary premises for Center for Cellular Imaging, CCI, who will move from 7A to Medicinaregatan 5. The work means disturbing noise particularly during hours stated below.
This reconstruction work is estimated to be ready by end of January, 2020.
Hours in week 7 with increased noise disturbances:
- Mon Feb 10, 07:00-08:00
- Tue Feb 11, 07:00-08:00
- Wed Feb 12, 07:00-09:00, 12:00-13:00
- Thu 13, 07:00-09:00, 11:00-13:00
- Fri 14, 07:00-08:00
Here you can see a map of rebuilding CCI (Swedish only): https://gubox.box.com/s/6s3uohqnpk0jtzum6fjorn45b338hawl
Modules at Lundberg Laboratory
The construction is largely completed and the passage between the actual building and the modules is in place. Some work remains, automatic door openers to mention one example.
The supplier of laboratory furnishings will be on site and start to prepare for deliveries.
Lundberg Laboratory
The replacements of ventilation units on the roof of the Lundbergslab is completed.
On the third and fourth floor work has come quite far. Additional installations are carried out and thereafter preparations for the deliveries of laboratory furnishings are made. The deliveries might cause waiting times for those who need to use the lifts.
Further on the reconstruction on second floor will start, but currently no time plan has been presented.
New premises for the Faculty of Science
The expanded outloading behind the EBM media central is completed in week 7 and are back at the previous speed.
A new activity in week 7 is that a smaller excavator will dig to locate cables along the facade of Nya Forsken. This work needs to be handled very carefully and manual work be carried out where needed.
Blasting in week 7 will take place Tuesday and Thursday at 12.30 with reserve time at 15.00 on the same days.
In the Staff Portal you will find more information about construction projects on Medicinareberget: https://medarbetarportalen.gu.se/sahlgrenskaakademin/byggprojektmedicinareberget/