Outside the work cabins, across the street from the building Zoologen, a section of the coming façade of Natrium is displayed. Prior to a steering committee meeting, the team stopped by to take a closer look. Project Manager Mats Lilja, informed the steering committee about the design of the bronze-colored façade.
The production of Natrium is progressing and in parallel with casting and the completion of the blasting, purchasing are already being made of the various parts of the house, including the facade.